Production and shipping times for custom shin guards
For 20–100 pairs of standard printed guards, production is usually completed in 1–3 days after artwork approval, and shipping usually takes 7–15 days after dispatch. Mixed sizes and different prints on each pair do not extend this estimate. For a single personalised mini shin-guard order, production usually takes 24–48 hours after artwork approval; allow an extra day over weekends. These are estimates, not guarantees: your quotation gives the timing for your destination.
International shipping is available. Send your destination, product and quantity for a quotation. Certificates can be applied for if needed. Tell us your requirements with your enquiry.
- 20–100 standard printed pairs: usually 1–3 days after artwork approval
- Shipping usually 7–15 days after dispatch
- Express or Standard / Economy
- Ships direct to your customer
Custom-printed shin guards · US$12–15 per pair
Custom printing, standard packaging, shipping, VAT and other import charges included. Only the applicable EU €3 customs duty is extra. Your quotation gives the exact price.
For eligible EU consumer consignments with a total intrinsic goods value of no more than €150, the temporary duty is €3 per customs item line. Several identical pairs grouped on one line can incur €3 in total. Grouping depends on the tariff classification, description and, where required, origin.
Each consignment is assessed separately. Shipments above €150 follow normal customs rules; €3 is not a cap on the duty for a bulk order.
Bulk orders. Pricing and who covers customs duty can be negotiated. Your quotation states any changes to the standard price inclusions before you order.
Your quotation shows the included shipping service and any applicable €3 EU duty separately before you order. Socks, sleeves, sets and optional packaging are quoted separately. Read the European Commission guidance (PDF).
Artwork first. One pair or a few pairs go straight to production and dispatch after you approve the design draft, without a separate physical sample. Larger orders use an agreed sample before the main run.
Production, then transit. Production runs from artwork approval and covers completion; transit starts after dispatch. Shipping usually takes 7–15 days after dispatch, as an estimate; the tables below give per-service transit estimates for Express and Standard / Economy, in working days by destination. Agree the dispatch date, and whether your schedule counts working or calendar days, before ordering, and tell us any required arrival date.
Two channels. Express is the faster tracked option where the destination and the packed weight qualify. Standard / Economy costs less and reaches more destinations. A dash in the Express column means Standard / Economy is the channel quoted for that lane.
Larger-order samples. An agreed physical sample travels by courier and is quoted all-in, including the pair and shipping. Its timing is agreed separately from the main run.
Duties and customs. The guards are declared under HS code 9506.91 (China export code 9506919000). For the custom-printed guard price above, VAT and other import charges are included; only the applicable EU €3 customs duty is extra.
Your own forwarder. Your own forwarder or collect account can be used; give the details with your enquiry.
Direct to your customer. Orders can ship straight to a reseller's end customer, packed as your quotation names.
How a single pair is packed
Standard packaging is included in the price. Single-pair orders are sent in a plain mailing pouch like the one shown.
Any additional packaging requirements, including storage boxes or custom packaging, cost extra and are quoted before ordering.
If your parcel is lost or does not arrive
The desk arranges a replacement or refund for a lost or undelivered order. Send your order reference and any tracking information, then agree the resolution with the desk. Read the lost-parcel FAQ.
Shipping services by destination
Orders leave the Guangzhou warehouse of RyanFulfil through Express or Standard / Economy. Compare the transit estimates below in working days from dispatch; your quotation names the service included and the timing for your order.
Major routes
| Destination | Region | Express | Standard / Economy |
|---|---|---|---|
| North America | |||
| United States | North America | 5–8 days | 6–12 days |
| Canada | North America | 5–7 days | 7–9 days |
| Europe / United Kingdom | |||
| United Kingdom | United Kingdom | 3–5 days | 5–8 days |
| Germany | Central Europe | 4–6 days | 6–10 days |
| France | West Europe | 3–5 days | 6–10 days |
| Netherlands | West Europe | 3–6 days | 6–10 days |
| Belgium | West Europe | 3–6 days | 6–10 days |
| Spain | South Europe | 5–8 days | 6–10 days |
| Italy | South Europe | 5–8 days | 6–10 days |
| Sweden | North Europe | 5–7 days | 6–10 days |
| Denmark | North Europe | 5–7 days | 6–10 days |
| Austria | Central Europe | 6–8 days | 6–10 days |
| Switzerland | Central Europe | 6–9 days | — |
| Asia-Pacific | |||
| Australia | Oceania | 4–7 days | 5–8 days |
| Japan | East Asia | 4–6 days | — |
| Hong Kong | East Asia | 2–5 days | — |
Every other destination
Type a country or region to filter the list, or open it in full. Where Express shows a dash, Standard / Economy is the channel quoted.
All other destinations
| Destination | Region | Express | Standard / Economy |
|---|---|---|---|
| North America | |||
| Mexico | North America | — | 8–12 days |
| Puerto Rico | Caribbean | — | 15–20 days |
| Europe / United Kingdom | |||
| Poland | Central Europe | 6–8 days | 6–10 days |
| Ireland | West Europe | — | 6–10 days |
| Portugal | South Europe | — | 6–10 days |
| Norway | North Europe | — | 8–10 days |
| Finland | North Europe | — | 6–10 days |
| Czech Republic | Central Europe | — | 6–10 days |
| Slovakia | Central Europe | — | 6–10 days |
| Hungary | Central Europe | — | 6–10 days |
| Romania | East Europe | — | 6–10 days |
| Bulgaria | East Europe | — | 6–10 days |
| Slovenia | Central Europe | — | 6–10 days |
| Croatia | South Europe | — | 6–10 days |
| Latvia | North Europe | — | 6–10 days |
| Lithuania | North Europe | — | 6–10 days |
| Estonia | North Europe | — | 6–10 days |
| Luxembourg | West Europe | — | 6–10 days |
| Malta | South Europe | — | 6–10 days |
| Greece | South Europe | — | 8–12 days |
| Cyprus | South Europe | — | 8–12 days |
| Iceland | North Europe | — | 12–15 days |
| Turkey | East Europe | — | 15–20 days |
| Serbia | East Europe | — | 15–20 days |
| Albania | South Europe | — | 15–20 days |
| North Macedonia | South Europe | — | 15–20 days |
| Belarus | East Europe | — | 15–20 days |
| Georgia | East Europe | — | 15–20 days |
| Armenia | East Europe | — | 15–20 days |
| Faroe Islands | North Europe | — | 15–20 days |
| Greenland | North Europe | — | 15–20 days |
| Gibraltar | South Europe | — | 15–20 days |
| Liechtenstein | Central Europe | — | 15–20 days |
| Monaco | West Europe | — | 15–20 days |
| San Marino | South Europe | — | 15–20 days |
| Vatican | South Europe | — | 15–20 days |
| Andorra | South Europe | — | 15–20 days |
| Guernsey | West Europe | — | 15–20 days |
| Jersey | West Europe | — | 15–20 days |
| Ukraine | East Europe | — | 10–12 days |
| Moldova | East Europe | — | 10–25 days |
| Montenegro | South Europe | — | 17–19 days |
| Russia | East Europe | — | 15–30 days |
| Asia-Pacific | |||
| South Korea | East Asia | 5–8 days | 6–8 days |
| Singapore | Southeast Asia | 5–6 days | 6–7 days |
| Vietnam | Southeast Asia | 5–6 days | — |
| Thailand | Southeast Asia | 5–8 days | — |
| Indonesia | Southeast Asia | 7–9 days | — |
| Macau | East Asia | 3–5 days | — |
| New Zealand | Oceania | — | 6–10 days |
| Malaysia | Southeast Asia | — | 8–10 days |
| Philippines | Southeast Asia | — | 8–10 days |
| Sri Lanka | South Asia | — | 15–20 days |
| India | South Asia | — | 15–20 days |
| Pakistan | South Asia | — | 15–17 days |
| Bangladesh | South Asia | — | 15–20 days |
| Myanmar | Southeast Asia | — | 15–20 days |
| Taiwan | East Asia | — | 15–20 days |
| North Korea | East Asia | — | 15–20 days |
| Middle East | |||
| Israel | Levant | — | 6–10 days |
| UAE | Gulf | — | 6–10 days |
| Saudi Arabia | Gulf | — | 8–12 days |
| Qatar | Gulf | — | 8–12 days |
| Kuwait | Gulf | — | 8–12 days |
| Bahrain | Gulf | — | 8–12 days |
| Jordan | Levant | — | 10–14 days |
| Lebanon | Levant | — | 15–20 days |
| Caucasus & Central Asia | |||
| Azerbaijan | Caucasus | — | 13–15 days |
| Uzbekistan | Central Asia | — | 15–20 days |
| Kyrgyzstan | Central Asia | — | 15–20 days |
| Africa | |||
| South Africa | Southern Africa | — | 8–12 days |
| Morocco | North Africa | — | 10–15 days |
| Mauritius | East Africa | — | 9–14 days |
| Seychelles | East Africa | — | 8–13 days |
| Rwanda | East Africa | — | 9–13 days |
| Réunion | East Africa | — | 10–15 days |
| Madagascar | East Africa | — | 10–15 days |
| Tanzania | East Africa | — | 11–13 days |
| Angola | Central Africa | — | 11–13 days |
| Senegal | West Africa | — | 11–15 days |
| Zambia | Southern Africa | — | 11–18 days |
| Nigeria | West Africa | — | 13–16 days |
| Kenya | East Africa | — | 13–16 days |
| Ghana | West Africa | — | 13–16 days |
| Uganda | East Africa | — | 13–16 days |
| Mayotte | East Africa | — | 13–16 days |
| Egypt | North Africa | — | 15–20 days |
| Ethiopia | East Africa | — | 15–20 days |
| Algeria | North Africa | — | 15–20 days |
| Cameroon | Central Africa | — | 15–20 days |
| Ivory Coast | West Africa | — | 15–20 days |
| Zimbabwe | Southern Africa | — | 15–20 days |
| Namibia | Southern Africa | — | 15–20 days |
| Mozambique | Southern Africa | — | 15–20 days |
| Lesotho | Southern Africa | — | 15–20 days |
| Liberia | West Africa | — | 15–20 days |
| Eritrea | East Africa | — | 15–20 days |
| Gabon | Central Africa | — | 15–20 days |
| Comoros | East Africa | — | 15–20 days |
| Latin America | |||
| Brazil | South America | — | 15–25 days |
| Argentina | South America | — | 15–20 days |
| Chile | South America | — | 19–21 days |
| Colombia | South America | — | 19–21 days |
| Peru | South America | — | 15–23 days |
| Uruguay | South America | — | 15–20 days |
| Costa Rica | Central America | — | 15–20 days |
| French Guiana | South America | — | 15–20 days |
| Suriname | South America | — | 15–20 days |
| Falkland Islands | South America | — | 15–20 days |
| Ecuador | South America | — | 17–22 days |
| Paraguay | South America | — | 20–30 days |
| El Salvador | Central America | — | 20–30 days |
| Bolivia | South America | — | 30–40 days |
| Honduras | Central America | — | 30–40 days |
| Nicaragua | Central America | — | 30–40 days |
| Guatemala | Central America | — | 47–50 days |
| Panama | Central America | — | 54–57 days |
| Pacific Islands | |||
| Tonga | Pacific Islands | — | 15–20 days |
| Vanuatu | Pacific Islands | — | 15–20 days |
| Samoa | Pacific Islands | — | 15–20 days |
| Palau | Pacific Islands | — | 15–20 days |
| Micronesia | Pacific Islands | — | 15–20 days |
| Marshall Islands | Pacific Islands | — | 15–20 days |
| Kiribati | Pacific Islands | — | 15–20 days |
| Tuvalu | Pacific Islands | — | 15–20 days |
| Nauru | Pacific Islands | — | 15–20 days |
| Cook Islands | Pacific Islands | — | 15–20 days |
| Niue | Pacific Islands | — | 15–20 days |
| Christmas Island | Pacific Islands | — | 15–20 days |
| Northern Mariana Islands | Pacific Islands | — | 15–20 days |
| Wallis & Futuna | Pacific Islands | — | 15–20 days |
Planning your arrival date
- Compare Express and Standard / Economy for your destination using RyanFulfil's shipping times by country; your quotation names the current service.
- Times are working days from dispatch. They do not include the production time named on your quotation, or customs processing at the destination.
- If your country is not listed, send it with your enquiry and the desk quotes the channel available.
Plan your order
Read how customisation works for the order sequence, the size guide for the centimetres, and the buyer FAQ for packing and who you contract with. Then send your country, quantity and preferred channel to the desk.
Quote shipping for my order Build a written enquiry
Notes
The transit table is a copy of RyanFulfil's published shipping times by country, route reference 6 September 2026. The price and packaging guidance was reviewed on 10 September 2026.
Day counts are a guide. Your quotation states the timing for other quantities or custom development, and the shipping service for your destination.